By early April the new room closed to the outside and wrapped in preparation for stucco. The upper deck also got closed in and wrapped.
There were several sliding doors in our original home construction that turned out not to work well and / or would not make sense with the decisions made for the sunroom. The doors in the dining room and family room were removed and turned into windows.
Needless to say, these changes had to be made very quickly since they opened the house to the outside elements.
The sliding door on the deck above the garage was changed to a much nicer door.
Then it was time to open the house to the new sunroom. The kitchen windows and doors on that side were removed and a window in the family room was changed so there was a door.
Likewise, the master bedroom was opened to where the deck had been.
Then it was time for rough electrical, heating, fire sprinkler modifications, insulation and all the other things that are inside the walls and need to get done before the drywall is put in place.